2021/09/24:

The team members introduced themselves, took the group selfie and assigned roles.

Untitled

2021/10/01:

The group was assigned its scenario, finalized objective tree was produced, the team came up with the problem statement, and lastly the top three objectives were chosen with the respective reasonings behind them.

Untitled

2021/10/08:

The primary and secondary MPIs were calculated, the top materials were then chosen from Granta based on their MPIs, and lastly the top material for the project was chosen based on the decision matrix.

Untitled

Untitled

2021/10/15:

The deflection was estimated using the given formulas and a solid model of the turbine blade was made using inventor.

Untitled

2021/10/22:

Each member calculated the estimated deflection of its given scenario using the assigned thickness and a simulation was done using inventor to find the optimal blade thickness. And in the end our results were compared with another group